1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.

New Summit Rumor...

Discussion in 'General' started by Macon663, Jan 19, 2010.

  1. Macon663

    Macon663 Well-Known Member

    I hear its being completely repaved in March.

    Anyone know anything more?
     
  2. aedwards01

    aedwards01 Well-Known Member

    Yeah, they contracted bumpy road paving to get the job done. Same company they used last time.:D
     
  3. DucatiBomber

    DucatiBomber DJ Double A

    Hopefully they run cars on it the day after it's paved so that T1 and the entire back section ends up like tar and chip:crackup:
    ride safe,
    AAron
     
  4. aedwards01

    aedwards01 Well-Known Member

    Dump trucks get first crack at it.:up:
     
  5. GixxerBlade

    GixxerBlade Oh geez

    :crackup:
    Keep in mind that Wood did set the track record, again, on that bumpy, crappy track. Makes me feel slow just talking about it.
     
  6. BiZ

    BiZ a matter of weight ratios

    I hate these threads more then I hate the threads about the latest pipe dream track that's opening up in someones back yard....
     
  7. Sacko DougK

    Sacko DougK Well-Known Member

    They're putting concrete patches in T1, and T5-T8. :D
     
  8. slow honda

    slow honda Well-Known Member

    I heard they're doing the whole track in concrete
     
  9. Cannoli

    Cannoli Typical Uccio

    that would actually be fine with me! Would be nice to have the same track from week to week.
     
  10. bel-biv

    bel-biv Well-Known Member

    Hope springs eternal.
    I'll believe it when I see it.
     
  11. Claussen

    Claussen Well-Known Member

    Heard it from a VERY solid source that it was indeed true.. soil samples, core samples, the whole shebang has already been done.. SUPPOSED to be done properly as well.. shutting it down for a full 3 weeks to allow for a proper cure time.. HOWEVER I was told on another board that the project was cancelled.. I heard on Sunday afternoon, so it is possible that they pulled the plug yesterday I guess..
     
  12. Suburbanrancher

    Suburbanrancher Chillzilla

    I've heard the same thing except for the pulling the plug part.

    Finger crossed it gets done and done right.
     
  13. kanatuna

    kanatuna You can't polish a turd..

    So this would be before our race there? Doesnt matter to me...I have never raced there regardless....
     
  14. Stillie

    Stillie Off that like Jay-Z

    I'm opening a half pipe in my backyard...
     
  15. Tortuga

    Tortuga Well-Known Member

    A Summit Point re-pave thread?
    Must be mid-January.
     
  16. Gigantic

    Gigantic Maverick Moto Media

    Summit point rumors are like assholes; everybody has one. I'll believe it when I see it, but I sure as hell won't hold my breath.
    Still, if Grattan is getting repaved, anything can happen.
     
  17. tittys04

    tittys04 Well-Known Member

    Grattan's getting repaved?!
     
  18. mikendzel

    mikendzel Anonymous

    Again?!?!

    That's actually what happened last time. I ran into one of the pavers at Wendy's in Charles Town.
     
  19. ton

    ton Arf!

  20. tittys04

    tittys04 Well-Known Member

    very cool. Don't know when I'll be able to get up there again, but def. looking forward to it now. I liked it before the repave... can't wait to see it new!
     

Share This Page